In this project, energy is removed from the wastewater in order to provide a residential development with energy. The audit of the project conditions proved to be successful, because the waste water coming through the introduction of a paper mill at a temperature of 40 ° C, with a high flow rate to the extraction point. Thus, the waste water can be introduced directly into the heating circuit, without it to heat before. The only energy required for this waste water utilization system is to operate a Pumped that promote the water that are pumped as a fuel in the lines in the circle must. This leads to an energy saving of 90% and a CO2 reduction compared to conventional heating systems by almost 95%."/>








Submitted by: Baumeister Taubinger Gmbh
Implemented country: Austria
Title: First wastewater utilization system Wolfsberg

In this project, energy is removed from the wastewater in order to provide a residential development with energy. The audit of the project conditions proved to be successful, because the waste water coming through the introduction of a paper mill at a temperature of 40 ° C, with a high flow rate to the extraction point. Thus, the waste water can be introduced directly into the heating circuit, without it to heat before. The only energy required for this waste water utilization system is to operate a Pumped that promote the water that are pumped as a fuel in the lines in the circle must. This leads to an energy saving of 90% and a CO2 reduction compared to conventional heating systems by almost 95%.



Category: Fire