In peak periods, ie periods in which, for example, fewer phone calls or data is transmitted and thus the network is not busy, not to the required resources are temporarily disabled. This measure is of course as much energy and CO2 savings, without adversely affecting the quality of the network. Mobilkom austria/A1 for this project has a specific method to control the resources developed. Innovation and thus the services in the telecommunications sector may lead to increased environmental pollution. This project was intended to counteract this stress. The project was turned over Austria at about 1,000 locations, which amounts to the energy gain per site activated at about 10%."/>








Submitted by: mobilkom austria AG
Implemented country: Austria
Title: A1 Energy Management - energy efficiency through intelligent use of resources GSM

In peak periods, ie periods in which, for example, fewer phone calls or data is transmitted and thus the network is not busy, not to the required resources are temporarily disabled. This measure is of course as much energy and CO2 savings, without adversely affecting the quality of the network. Mobilkom austria/A1 for this project has a specific method to control the resources developed. Innovation and thus the services in the telecommunications sector may lead to increased environmental pollution. This project was intended to counteract this stress. The project was turned over Austria at about 1,000 locations, which amounts to the energy gain per site activated at about 10%.



Category: Air